Our Services
"We Have A Highly Reputed Set of Valued Clients Whom We Have Delivered Quality Results We Take Pride in Keeping Our Clients Elated And Satisfied With Our Service"






























CAMPING & CATERING
- Camp buy and sale.
- Camp service.
- Camp provide for rent.
- Catering service.
- Build new Camp.
MANPOWER SUPPLY
- Management Staff.
- Mechanical
- Engineer.
- Electrical Engineer.
- Civil Engineer.
- I.T Engineer.
- Safety Engineer.
- Skilled Worker.
ELECTRICAL DIVISION SUBSTATION
- Industrial Electrical Work.
- Commercial
- Electrical Work.
- Maintenance Work.
- Installation Electrical Work.
- Construction Electrical Work.
- Calibration Electrical Work.
- Panel Electrical Work.
- Cable Puling Work.
PROCEDURE OF ELECTRICAL PANEL INSTALLATIONS
- Check feeder wires for power.
- Open knockouts in box.
- Mount the circuit breaker panel.
- Install the main service wires.
- Connect the main ground wire.
- Connect the main service neutral.
- Connect the main breaker.
- Pull wires for branch circuits.
TRANSMISSION
- Trial Pit Work.
- Excavation Work.
- Steel Work.
- Gravel Work.
- Backfilling Work.
- Pads Work.
- Segregation Work.
- Assembly Work.
- Erection Work.
- Bolt Tightening Work.
- Pall Nut.
- Paint Work.
CIVIL DIVISION CONSTRUCTION
- Building Construction (All Type of Building Tower).
- Design & Engineering All Types.
- Civil Structure.
- Steel Structure.
- Precast Structure.
- Building Finishing Work.
- Interior Work.
MECHANICAL DIVISION
THERMAL POWER PLANT.
- Pressured Water Reactor.
- Boiling Water Reactor.
THERMAL POWER PLANT
- Transmission Lines –Conduct Electricity.
- Dam – Store Water.
- Penstock – Carries Water to Turbines.
- Generators – Rotated by The Turbines to Generator Electricity.
- Turbines – Turns by The Force of Water on Blades. DISTILLATION COLUMN.
- Vapour outlet to Condenser.
- Liquid Distributor.
- Structure Packing.
- Packing Support.
- Random Packing.
HEAT VENTILATION & AIR CONDITIONING - HEATING & COOLING PRODUCT.
- Furnace.
- Air Conditioner.
- Heat Pump.
- Ductless System.
- Thermostat.
HEATING & COOLING TERMS.
• AFUE0.
• SEER.
• HSPE.
• Split System.
• Packing System.
• Heating Stages.
• Cooling Stages.
• Hybrid System.
PROCEDURE FOR PLANT LAYOUT.
• Construct Master Layout.
• Developed & Evaluate Alternative Layouts.
• Check Final Layout.
• Installation of The Layout.
PROCEDURE FOR BUILDING PLANT LAYOUT.
• Accumulate Basic Data.
• Analyze and Coordinate Basic Data.
• Decide Equipment and Machinery Required.
• Select The Material Handling System.
• Sketch Plan of The Plot.
• Determine a General Flow Pattern.
STAGES OF ROAD CONSTRUCTION
- Clearing and
- Excavation.
- Mounting.
- Fine Grading.
- Aggregate Base.
- Asphalt Paving.
ROAD CONSTRUCTION METHOD
- Asphalt Paving.
- Cement Concrete
- Paving.
- Tar and
- Chip/Macadam.
MACHANICAL DIVISION
Project Personnel Organize And Manage A Full Range Of Services Necessary To Oversee The Project Planning And Project Management Demands, Right From Master Planning To Execution.
OUR MAIN FOCUS IS TO
Meet The Project Schedule Avoid Budget Overrun Maintain Sound Technical Quality.
WE ATTAIN THESE OBJECTIVES BY
- Using Appropriate Tools, Including Primavera And SAP Technology, We Plan For Every Micro Stages of The Project To Provide Fast Information Flow Between Different Phases And Close Collaboration of Multi Disciplines of The Project.
- Maximizing Results by Effectively Utilizing The Resources (Manpower, Material, Etc.).
- Keeping Customers Regularly Updated on The Project Progress Through Regular Meetings And Updated Reports.
- We Have Attained Our Project Management Expertise Through Detailed Planning And The Experience With An Impressive Record of Executed Projects.